Sunday, November 29, 2009

House Nov.26th. Thanksgiving



House Nov.26th. Thanksgiving






Upstairs tile being done. Cabinets and countertop have been installed. Cabinets were stained twice. Almost all rooms

House Nov.26th. Thanksgiving






Alot has been done the past month. Looks like it's finally coming together. =)

Tuesday, November 10, 2009

House beginning of November 2009





The dirt was put back into place for a second time. There is a drain tube that runs along the outside of the basement wall and runs out to the edge of the driveway. Painting is almost the last thing to do so I'm excited about it almost being ready for primer & paint. =)

Beginning of November House






Drywall going up everywhere. Green drywall is mildew resistant so that's in the basement. A couple rooms upstairs are almost completely ready to painted. Probably tomorrow.

Thursday, November 5, 2009

We have a MOAT & bridge ! House 10-31-09






We had to re-dig out 3 sides of the house. It was leaking bad in two areas. We are putting a drain tube and alot more gravel rocks on the sides of the house so it drains alot better. Missouri has SO much water it was hard to make this basement waterproof.

Drywall going UP in rooms upstairs 10-31-09






That really long tool is a metal bender. It's being used to cover all the old wood outside. Every trim piece will be nice and White.

Bathroom / Tool room !




Ugly cealing was under drop cealing. We're going to put drywall over that to keep the tall cealing.
Bathroom / TOOL ROOM.

woo hoo Drywall ready to be used!


Water problem area in basement.


There was a couple inches of water by this wall. It kept trickeling in like a faucet.

basement door entrance

House Oct31,2009


Tool area in the basement, everything up on a shelf because the house started to leak water.

House Oct31,2009





Basement. Framed and some doors hung. Downstairs bathroom is ready is plumbed and ready.